Create and Update an Unresourced Project using Elecosoft (Asta) Powerproject Version 15.2 - Harris, Paul E
- Format: Broché Voir le descriptif
Vous en avez un à vendre ?
Vendez-le-vôtre51,03 €
Produit Neuf
Ou 12,76 € /mois
- Livraison à 0,01 €
- Livré entre le 26 mai et le 3 juin
Brand new, In English, Fast shipping from London, UK; Tout neuf, en anglais, expédition rapide depuis Londres, Royaume-Uni;ria9781925185751_dbm
- Payez directement sur Rakuten (CB, PayPal, 4xCB...)
- Récupérez le produit directement chez le vendeur
- Rakuten vous rembourse en cas de problème
Gratuit et sans engagement
Félicitations !
Nous sommes heureux de vous compter parmi nos membres du Club Rakuten !
TROUVER UN MAGASIN
Retour
Avis sur Create And Update An Unresourced Project Using Elecosoft (Asta) Powerproject Version 15.2 Format Broché - Livre Littérature Générale
0 avis sur Create And Update An Unresourced Project Using Elecosoft (Asta) Powerproject Version 15.2 Format Broché - Livre Littérature Générale
Les avis publiés font l'objet d'un contrôle automatisé de Rakuten.
-
Portfolio Joubert "Les Scouts"
Occasion dès 75,00 €
-
Ocp Oracle Certified Professional Java Se 21 Developer Study Guide
Neuf dès 72,73 €
-
Western Technology And Soviet Economic Development 1945-1968
Neuf dès 60,23 €
-
The Complete Guide To High-Fire Glazes
3 avis
Neuf dès 27,03 €
Occasion dès 40,98 €
-
La Méthodologie Wyckoff En Profondeur: Comment Effectuer Des Transactions Logiques Sur Les Marchés Financiers.
Occasion dès 26,08 €
-
Toute Photographie Fait Énigme
Occasion dès 45,80 €
-
Kodak Pixpro Fz55 :
Neuf dès 48,99 €
-
Bonahuc, Au Coeur Des Cévennes
Occasion dès 29,00 €
-
Married Women Who Love Women
Neuf dès 43,60 €
-
Handbook Of Multilingualism And Multiculturalism
Neuf dès 60,00 €
Occasion dès 50,00 €
-
Locals Only
1 avis
Neuf dès 27,05 €
Occasion dès 38,00 €
-
Under Siege
Neuf dès 40,31 €
-
Billy Showell's Botanical Painting In Watercolour
1 avis
Neuf dès 29,93 €
-
Moonwalk By Michael Jackson
2 avis
Occasion dès 70,46 €
-
The Young Adventurer's Collection [Dungeons & Dragons 4-Book Boxed Set]
Neuf dès 35,49 €
-
Gottfried Wilhelm Leibniz: De Conditionibus (Bibliotheque Des Textes Philosophiques)
Neuf dès 37,00 €
-
The Young Adventurer's Collection Box Set 2 (Dungeons & Dragons 4-Book Boxed Set)
Neuf dès 37,27 €
-
Scottish Public Opinion And The Anglo-Scottish Union, 1699-1707
Neuf dès 30,01 €
-
L'italien
2 avis
Neuf dès 26,90 €
Occasion dès 30,58 €
-
Best Karate, Vol.3
Occasion dès 39,00 €
Produits similaires
Présentation Create And Update An Unresourced Project Using Elecosoft (Asta) Powerproject Version 15.2 Format Broché
- Livre Littérature Générale
Résumé :
This book has been superceeded by Create and Update an Unresourced Project using Elecosoft (Asta) Powerproject Version 16: 2-day training course handout and student workshops - ISBN 9781925185812. All scheduling software is difficult to learn for a number of reasons. None have the optimal settings when installed and templates, views and default options need to be adjusted to obtain the best possible performance. Usually the Help files do not connect the user to real life situations and do not explain the practical use of functions. Furthermore, there are many flicks and switches with obscure names that are difficult to understand or decide what they do or which are important. These issues make learning the software very difficult without a comprehensive guide written by an experienced user. Investing in a book written by Paul E Harris will address all these issues and allow you to setup the software properly and understand all the obscure functions letting you become productive more quickly and enhance your career opportunities and salary with a solid understanding of the software. This book is designed as a student handout for a two-day training course and may also be used as a self-teach book. This course objectives are to teach participants: ? The user interface, ? How to create a projects, ? Scheduling projects without resources, ? Filters, Views, Sorts and Printing, ? Creating and assigning a baseline and ? Updating an un-resourced project. Most chapters are reinforced by student workshops. This book is written by an experienced scheduler, who has used the software at the sharp end of projects and is not a techo. It draws on the author's practical experience in using the software in a wide variety of industries. It presents workable solutions to real day to day planning and scheduling problems and contains practical advice on how to set up the software and import data.
Biographie:
Paul Harris is the founder and director of Eastwood Harris Pty Ltd, a Melbourne Australia consulting firm that serves project management professionals, engineers and large organizations around the world. Eastwood Harris offers high level consulting and training on project management and controls. Harris is the author of more than a dozen books on project management software and is a Certified Cost Engineer, a certified PRINCE2 Practitioner and a member of the Project Management Institute (PMI). Visit his web site at http://www.eh.com.au.
Sommaire:
Paul E Harris has worked in the project controls industry for a number of years and has assisted many companies in a range of industries to set up and run project controls systems with a strong focus on project scheduling software. He is the author of dozens of books on project management software including books on Oracle Primavera, Microsoft Project and Elecosoft (Asta) Powerproject. His Melbourne, Australia based company, Eastwood Harris Pty Ltd, offers project controls consulting and training services worldwide based on the books he has written and published. Paul Harris holds an Honours Degree in Civil Engineering obtained in the UK and is a Certified Cost Engineer through AACEI International, a PRINCE2 Registered Practitioner and a Managing Successful Programmes Registered Practitioner....
Détails de conformité du produit
Personne responsable dans l'UE