Personnaliser

OK

Informations importantes : Arrêt du Club R (13 août) et Cessation d'Activité (30 septembre)

En savoir plus.

Machining Productivity Improvement - Goel, Bhaskar

Note : 0

0 avis
  • Soyez le premier à donner un avis

83,30 €

Produit Neuf

  • Ou 20,83 € /mois

    • Livraison : 25,00 €
    • Livré entre le 8 et le 14 septembre
    Voir les modes de livraison

    Kelindo

    PRO Vendeur favori

    4,8/5 sur + de 1 000 ventes

    Apres acceptation de la commande, le delai moyen d'expedition depuis le Japon est de 48 heures. Le delai moyen de livraison est de 3 a 4 semaines. En cas de circonstances exceptionnelles, les delais peuvent s'etendre jusqu'à 2 mois.

    Publicité
     
    Vous avez choisi le retrait chez le vendeur à
    • Payez directement sur Rakuten (CB, PayPal, 4xCB...)
    • Récupérez le produit directement chez le vendeur
    • Rakuten vous rembourse en cas de problème

    Gratuit et sans engagement

    Félicitations !

    Nous sommes heureux de vous compter parmi nos membres du Club Rakuten !

    En savoir plus

    Retour

    Horaires

        Note :


        Avis sur Machining Productivity Improvement Format Broché  - Livre Technologie

        Note : 0 0 avis sur Machining Productivity Improvement Format Broché  - Livre Technologie

        Les avis publiés font l'objet d'un contrôle automatisé de Rakuten.


        Présentation Machining Productivity Improvement Format Broché

         - Livre Technologie

        Livre Technologie - Goel, Bhaskar - 01/05/2013 - Broché - Langue : Anglais

        . .

      • Auteur(s) : Goel, Bhaskar
      • Editeur : Lap Lambert Academic Publishing
      • Langue : Anglais
      • Parution : 01/05/2013
      • Format : Moyen, de 350g à 1kg
      • Nombre de pages : 120.0
      • ISBN : 3659389617



      • Résumé :
        Improvement of productivity is need of the hour for overall growth and development of an organization. The present work deals with a problem of low production tractor industry. The machining operation being one of the most important stages in manufacturing of various components has been focused in the present work. A thorough study of existing process plan revealed that there is enough scope of improvement in cycle time by modifying fixtures and cutting tools. The study has been carried out by identifying the machining of two critical components. About 30% Cycle time has been reduced by modifying jigs & fixtures and by implementing latest cutting tools. Fixture has been modified to accommodate 8 Cylinder Heads at time, Cutting tools with improved geometry and TiAlN coating. After implementing the modifications 41 % improvement in machining productivity has been achieved for Cylinder Head and 20% reduction in machining cost of one Cylinder Head. Machining cost of one Main Transmission Housing has been reduced by 16%.Further this study has resulted in annual savings of approx. Rs. 6.5 lakh and Rs.5 lakh in case of Cylinder Head and Main Transmission Housing respectively....

        Biographie:
        Working as Associate Professor in Department of Mechanical Engineering at Shoolini University, Solan,(INDIA).He is B.Tech.(Honours)from Aligarh Muslim University,M.Tech.(Honours)from Guru Nanak Dev Engineering College, Ludhiana and Pursuing Ph.D from the same College.He is having more than twenty one years of industrial & teaching experience....

        Détails de conformité du produit

        Consulter les détails de conformité de ce produit (

        Personne responsable dans l'UE

        )
        Le choixNeuf et occasion
        Le service clientsÀ votre écoute
        LinkedinFacebookTwitterInstagramYoutubePinterestTiktok
        visavisa
        mastercardmastercard
        klarnaklarna
        paypalpaypal
        floafloa
        americanexpressamericanexpress
        Rakuten Logo
        • Rakuten Kobo
        • Rakuten TV
        • Rakuten Viber
        • Rakuten Viki
        • Plus de services
        • À propos de Rakuten
        Rakuten.com